What are the scopes of minor, intermediate, and major repairs for a cone crusher?

Industry Knowledge

2026-09-22 16:18:49

Maintenance intervals should be determined based on the actual condition of the equipment.

Minor overhauls should be performed every two weeks to one month, including the following tasks:



(1) Inspect the bowl liner (bowl-shaped bearing/seat).

(2) Inspect the conical and cylindrical bushings for wear and check their clearances.

(3) Check the backlash (meshing clearance) of the bevel gears.

(4) Check the clearances of the drive shaft bearings.

(5) Inspect the hydraulic system (if equipped); check the lubrication system or replace the lubricating oil.

(6) Clean major components.

Intermediate overhauls should be performed approximately every 4 to 6 months, including the following tasks:

(1) Replace the liners.

(2) Repair or replace the eccentric bushing, conical bushing, and cylindrical bushing.

(3) Repair or replace the bowl liner and dust-sealing components.

(4) Repair or replace the bevel gears, drive shaft, and bearings.

(5) Repair the threads on the adjustment ring and support ring (main frame).

(6) Perform all inspections and maintenance tasks included in a minor overhaul.

(7) Disassemble the motor, remove dust and deposits, and check bearing clearances; disassemble oil-immersed switches, clean them, and address any defects; perform electrical adjustments and testing; inspect and repair distribution panels and cabling.

Major overhauls should be performed approximately every 4 years, or as determined by the actual condition of the equipment, including the following tasks:

(1) Repair or replace the main frame and any problematic foundation components.

(2) Perform all inspections and maintenance tasks included in an intermediate overhaul, as well as any necessary technical upgrades.

(3) Replace the motor stator coils (based on the results of preventive testing) and apply insulating varnish.

(4) Determine whether to replace the rotor shaft based on its actual condition.