What points should be kept in mind during the installation of a jaw crusher?

Industry Knowledge

2026-09-29 16:25:57

The following points should be observed during the installation of the machine:

(1) Given that a jaw crusher generates significant vibration during operation, it must be installed on a concrete foundation. To mitigate vibration, noise, and any potential impact on the foundations of nearby structures, a layer of hardwood, rubber belting, or other vibration-dampening material should be placed between the crusher and the concrete foundation.

(2) The discharge chute of the foundation must be lined with a metal plate and set at a sufficient incline (determined by the flow characteristics of the material, but no less than 50°) to ensure the smooth discharge of the crushed product.

(3) The size of the discharge opening should be adjusted according to the required product particle size. To make adjustments, loosen the T-bolts and the tension springs. Use the jacking bolts to push the adjustment seat open, then insert or remove shims of the appropriate thickness. Retract the jacking bolts; the adjustment seat will then press firmly against the frame’s lugs under the weight of the moving jaw, simultaneously compressing the shim assembly. Subsequently, adjust the pre-tension of the springs to ensure that the toggle plate remains in tight contact with the toggle seat during operation. Finally, lock the adjustment seat securely in place.